hers verification for residential

1. Comprehensive Documentation and On-Site Requirements

Building inspectors are responsible for ensuring that all compliance documents are available on-site. The key documentation categories include:

  • Certificates of Compliance (NRCC/LMCC): Ensure the design meets Title 24 energy standards.
  • Certificates of Installation (NRCI/LMCI): Verify that building systems and materials have been installed correctly.
  • Certificates of Verification (NRCA/LMCV): Confirm that performance testing has been conducted and systems are functional.

Without these forms, building projects risk non-compliance and potential delays in approval. Let’s explore the key forms required for different building systems.


2. Critical Energy Code Features by Category

To ensure compliance with Title 24 , building inspectors must verify that various building features meet the energy performance standards outlined in Title 24 report. Here’s a breakdown by category:

a) Building Envelope: Insulation, Windows, and Roofing

The building envelope plays a crucial role in thermal performance and energy savings. Inspectors must check for proper insulation, fenestration, and roofing materials.

  • Key Forms:
    • NRCI-ENV-E / LMCI-ENV-E: Installation of insulation, roofing, and opaque assemblies
    • NRCA-ENV-02-F: Verification for windows, overhangs, and shading devices

Inspectors should also ensure that special documentation for blower doors and Quality Insulation Installation (QII) is completed for multifamily units.


b) Mechanical Systems: HVAC and Ventilation

Efficient HVAC systems are central to Title 24 compliance. Inspectors need to verify proper equipment installation, airflow rates, and controls.

  • Key Forms:
    • NRCI-MCH-E / LMCI-MCH-E: HVAC system installation and performance verification
    • NRCA-MCH-03-A: Constant volume and single-zone system testing
    • NRCA-MCH-07-A: Variable fan and flow systems
    • NRCA-MCH-12,13-A: Economizer controls and fault detection

Special attention is required for fan efficiency, airflow rate, and refrigerant charge in multifamily units.


c) Electrical and Lighting Systems

Title 24 mandates energy-efficient lighting with advanced controls to optimize electricity consumption.

  • Key Forms:
    • NRCI-ELC-E / LMCI-ELC-E: Electrical distribution systems and demand response controls
    • NRCI-LTI-E / LMCI-LTI-E: Indoor and outdoor lighting installations
    • NRCA-LTI-02-A through LTI-05-A: Occupancy sensors, daylighting controls, and demand-responsive systems

Multifamily units require documentation for high-efficancy lighting and specific residential control requirements.


d) Plumbing and Water Heating

Efficient plumbing systems and water heating installations contribute to overall energy savings.

  • Key Forms:
    • NRCI-PLB-E / LMCI-PLB-E: Installation of water heaters, recirculation loops, and pipe insulation
    • NRCA-PLB-21-H: Verification of central domestic hot water systems in multifamily and hotel/motel buildings
    • Drain Water Heat Recovery (DWHR) Forms: Verification of energy-efficient heat recovery systems

e) Renewable Systems: Solar and Battery Storage

Title 24 emphasizes clean energy integration, including photovoltaic systems and solar readiness.

  • Key Forms:
    • NRCI-SAB-E / LMCI-SAB-E: Solar zones, structural requirements, and interconnection pathways
    • Photovoltaic and Battery Storage Forms: For verifying the location, type, and number of panels and batteries
    • Solar Thermal Forms: Documentation for solar water heating systems when required

3. Verification and Inspection Processes

Inspectors need to validate whether systems have undergone the required performance tests and documentation checks. For example:

  • HVAC Efficiency and Duct Sealing: Verified using forms like NRCA-MCH-04-A and LMCI-MCH-21-H.
  • Electrical Circuit Verification: Checked using NRCI-ELC-E forms for electrical distribution and controls.
  • Solar Installations: Ensured through NRCI-SAB-E forms and functional testing.

4. HERS and ATTCP: The Role of Third-Party Verification

  • HERS Raters: Essential for verifying multifamily building systems, including insulation, ventilation, and air sealing. Key forms include:
    • LMCI-ENV-H: Verification of insulation and envelope quality
    • LMCV-MCH-24-H: Ventilation system verification
  • Acceptance Test Technicians (ATTs): Required for validating mechanical and lighting system installations using NRCA forms ending with -A.

5. Streamlined Commissioning Requirements

For nonresidential buildings with conditioned spaces over 10,000 ft², commissioning is mandatory. The commissioning process involves:

  • Functional performance tests
  • Operation and maintenance (O&M) manuals for building owners

Key Form:

  • NRCC/LMCC-CXR-E: Verification of commissioning requirements

6. Special Focus Areas for Compliance

Inspectors should prioritize areas with stringent requirements, including:

  • Ventilation systems: Check minimum airflow rates and demand control ventilation through NRCA-MCH-02,03-A forms.
  • Ducting Systems: Ensure duct location and sealing meet standards using LMCI-MCH-20-H.
  • Water Heating: Verify recirculation systems and heat pumps with forms like NRCI-PLB-E.