Title 24 ADU Reports — CF1R Energy Compliance for Accessory Dwelling Units

Title 24 Calcs prepares Title 24 CF1R energy compliance reports for all ADU types in California. We cover detached ADUs, attached ADUs, JADUs, garage conversions, granny flats, and in-law units. Most ADU reports are ready within 1 to 2 business days starting at $250. We serve all California cities and climate zones. See our cities service area for your location.

California requires a Title 24 energy compliance report for every ADU permit submitted on or after January 1, 2026. This applies to new detached ADUs, attached ADUs, JADUs, garage conversions, and in-law units of any size. The 2025 California Building Energy Efficiency Standards introduced significant changes to ADU compliance. Heat pump baselines, updated insulation minimums, and expanded HERS verification requirements now apply to most new ADU projects. Furthermore, the compliance path — new construction versus alteration — determines which specific requirements your ADU must meet.

Title 24 Calcs prepares ADU reports for contractors, architects, designers, and homeowners throughout California. We confirm the correct compliance path for your specific project before starting any report. Additionally, we register every CF1R with an approved HERS provider before delivery. This means your report arrives ready for building department submittal.

Title 24 ADU Report — key facts:

• Provider: Title 24 Calcs — CF1R reports for all ADU types in California
• Code: 2025 California energy standards — effective January 1, 2026
• ADU types: Detached ADU, attached ADU, JADU, garage conversion, granny flat, in-law unit
• Climate zones: All 16 California zones covered
• Starting price: $250  |  Turnaround: 1 to 2 business days
• Includes: CF1R report, HERS registration, plan-sized PDFs, revision support

New Construction vs Alteration — The Most Important ADU Decision

The single most important factor in an ADU Title 24 report is the compliance path. California building departments classify ADUs as either new construction or alterations. This classification determines everything. It sets which systems your ADU must include. It determines whether solar PV applies. It also sets which HERS measures a rater must verify.

Getting this wrong is the most common cause of ADU plan check corrections. A report prepared under the wrong compliance path will fail plan check. This delays your permit and requires a complete revision. Title 24 Calcs confirms the correct compliance path with your building department before starting any report.

ADU Type Typical Classification Solar PV Required Battery Readiness
New detached ADUNew construction✅ Yes✅ Yes
Attached ADU — new additionNew construction✅ Yes✅ Yes
Garage conversion to ADUAlteration❌ Usually not❌ Usually not
Attached ADU — existing spaceAlteration❌ Usually not❌ Usually not
JADU within existing homeAlteration❌ Usually not❌ Usually not
ADU above detached garage — newNew construction✅ Yes✅ Yes
Important: The classifications above reflect the typical approach. Individual building departments may classify your project differently. Title 24 Calcs confirms your building department's specific classification before starting every report.

New Detached ADU — Title 24 Requirements Under the 2025 Code

A new detached ADU follows new construction compliance rules under the 2025 California energy code. In practice, this is the most demanding compliance path. Specifically, it requires full envelope insulation to current climate zone standards. Furthermore, heat pump baselines apply for space and water heating. Additionally, solar PV sized to the climate zone capacity factor also applies. Battery readiness wiring is mandatory as well.

Under the 2025 code, the prescriptive path requires these systems as minimum standards. Furthermore, HERS verification covers more measures than under the 2022 code. Moreover, a certified HERS Rater must now verify heat pump refrigerant charge in all 16 California climate zones. Notably, this requirement did not exist under the 2022 code.

What the CF1R covers for a new detached ADU:

  • Building envelope — wall insulation, ceiling insulation, floor insulation, window U-factor, window SHGC — all to climate zone minimums
  • Space heating and cooling — heat pump efficiency, sizing, and duct leakage requirements
  • Water heating — heat pump water heater baseline for units over 500 sq ft
  • Solar PV — system size calculated using climate zone capacity factor
  • Battery readiness — electrical panel capacity and wiring pathway required
  • Ventilation — whole-house mechanical ventilation flow rate specified
  • Lighting — JA8 high-efficacy fixtures in all habitable rooms and utility areas
Under-500 sq ft ADU water heating exception: New detached ADUs under 500 sq ft may qualify for a water heating compliance exception under the 2025 code. An electric tankless water heater may qualify instead of a heat pump water heater. Additionally, we confirm eligibility when you submit your plans.

The solar PV size for a new detached ADU depends on your California climate zone. Desert projects in Zone 15 require the largest solar systems. Coastal projects in Zone 6 require the smallest. We calculate the exact PV size for your zone before preparing your report.

Attached ADU — Title 24 Compliance

An attached ADU connects to the primary dwelling. Specifically, the compliance path depends on whether it involves new addition square footage or converts existing conditioned space. In that case, a new addition attached ADU follows new construction rules. An attached ADU created within an existing permitted structure follows alteration rules.

Under alteration rules, the 2025 code requires all new wall assemblies to meet current insulation minimums. Furthermore, new windows must meet current U-factor and SHGC requirements. Additionally, any new HVAC equipment must meet 2025 efficiency standards. Additionally, duct leakage testing by a HERS Rater applies if the project includes new ductwork or HVAC equipment.

In most cases, solar PV does not cover attached ADUs under the alteration path. Moreover, battery readiness wiring also typically does not apply. Some building departments may reclassify the project if conditioned floor area increases significantly. Title 24 Calcs confirms this with your building department before starting your report.

Garage Conversion to ADU — Title 24 Requirements

Garage conversions to ADUs are one of the most common ADU project types in California. In California, converting an attached or detached garage into a living unit requires a Title 24 alteration report. As a result, the project adds conditioned floor area and introduces new energy systems that trigger compliance requirements.

Under the alteration path, a garage conversion ADU must meet these specific requirements:

  • Wall insulation — all new and reframed walls must meet Zone insulation minimums. Garage walls typically have no insulation and must be fully upgraded.
  • Ceiling/roof insulation — garage ceilings must meet Zone insulation minimums. This often means adding batt insulation or rigid insulation above the roof deck.
  • Windows and doors — any new or replaced windows must meet 2025 U-factor and SHGC requirements for your climate zone.
  • HVAC — new heating and cooling equipment must meet 2025 efficiency minimums. New ductwork triggers duct leakage testing.
  • Water heating — new water heating equipment must meet 2025 efficiency standards. Heat pump water heaters apply to units over 500 sq ft in most cases.
  • Lighting — new lighting fixtures must meet JA8 high-efficacy requirements.
Solar PV for garage conversions: Garage conversion ADUs under the alteration path typically skip solar PV. Because of this, garage conversions are often more cost effective than building a new detached ADU.

An important detail for garage conversions: the garage slab is typically uninsulated concrete. In Zone 12 Sacramento and Zone 13 Fresno, slab edge insulation may apply under the 2025 code. Title 24 Calcs flags this requirement whenever it applies.

JADU — Junior Accessory Dwelling Unit Title 24 Report

In California, a JADU is a Junior Accessory Dwelling Unit. It is a self-contained living unit of up to 500 sq ft. It sits within the existing walls of a single-family home. JADUs are distinct from ADUs in several important ways. A JADU shares a wall with the primary dwelling. It may also share a bathroom. Furthermore, it must include a separate exterior entrance.

Therefore, JADUs follow the alteration compliance path in most cases. Because they convert existing conditioned space, solar PV and battery readiness typically do not apply. However, any new windows, doors, or HVAC equipment in the JADU scope must meet 2025 standards.

The 500 sq ft size limit for JADUs also triggers the water heating exception. Under this exception, an electric tankless heater may qualify instead of a heat pump water heater. In practice, this saves significant installation cost for owners of small units.

We prepare JADU reports for all California climate zones. Furthermore, we confirm the applicable HERS measures for your specific JADU scope before starting any report. Most JADU reports are ready within 1 to 2 business days.

CF1R, CF2R, and CF3R for ADU Projects

ADU permits follow the same three-certificate system as all California residential construction. The CF1R is the design-phase compliance document. After installation, the CF2R confirms each energy system went in correctly. A certified HERS Rater then signs the CF3R after field verification. All three must register with an approved HERS provider before the building department issues a certificate of occupancy.

CF1R Certificate of Compliance. Title 24 Calcs prepares this. Submitted with the ADU permit application at plan check. Shows the design meets all energy code requirements. CF2R Certificate of Installation. The installing contractor signs this for each energy system after installation — insulation, HVAC, water heater, windows, lighting. CF3R Certificate of Verification. A certified HERS Rater signs this after field verification. Required before the building department issues final occupancy.

HERS Testing for ADUs — What to Expect

HERS testing involves a certified third-party HERS Rater visiting your ADU after installation is complete. The Rater verifies that installed energy systems perform as your CF1R specifies. Furthermore, your building department requires HERS verification before issuing a certificate of occupancy.

Under the 2025 code, these HERS measures commonly apply to ADU projects:

  • Duct leakage testing — applies whenever new ductwork goes in. Duct systems must leak less than 5 percent of system airflow. This is the most commonly failed HERS measure in ADU projects.
  • Heat pump refrigerant charge verification — now mandatory in all 16 California climate zones under the 2025 code. This measure applies whenever a heat pump is part of the scope.
  • Whole-house ventilation flow rate — confirms the mechanical ventilation system delivers the required fresh air volume.
  • Envelope leakage — a blower door test may apply to new construction ADUs in certain climate zones.

Your CF1R lists the specific HERS measures that apply to your ADU project. Garage conversions and other alteration-path ADUs typically require fewer HERS measures than new detached ADUs. The California Energy Commission maintains the official list of approved HERS providers.

In practice, getting duct leakage right matters most on ADU projects. Specifically in Zone 10 and Zone 15, poorly sealed ducts dramatically increase cooling costs. We specify duct leakage targets on every CF1R to help your HVAC contractor pass the HERS test first time.

ADU Title 24 Requirements by Climate Zone

ADU energy requirements vary significantly across California's 16 climate zones. Zone 15 and Zone 7 have very different requirements. Insulation values, HVAC sizing, and solar PV all change by zone. Additionally, we confirm your exact climate zone by project address before starting any report.

Climate Zone Key Cities ADU Insulation Challenge
Zone 7Chula Vista, CarlsbadMild climate — lowest ADU insulation requirements
Zone 8Irvine, AnaheimModerate cooling loads — R-38 ceiling, R-15 wall minimum
Zone 10Corona, Temecula, Fontana, MurrietaHot inland — high cooling loads, duct leakage critical
Zone 12SacramentoHot summers and cold winters — dual season demands
Zone 13FresnoExtreme summer heat and cold winters — most demanding dual-season zone
Zone 15Palm Springs, Palm DesertExtreme desert — highest insulation and solar PV requirements in California

View our full California Title 24 climate zones guide for zone-by-zone details. We serve all California cities — see our cities service area for your location.

Frequently Asked Questions — Title 24 ADU Reports

Do I need a Title 24 report for an ADU in California?

Yes. All new ADUs, JADUs, granny flats, and garage conversions require a Title 24 CF1R energy compliance report. This applies to all permits submitted on or after January 1, 2026. Specifically, the compliance path depends on how your building department classifies the project. We confirm the correct path before starting your report.

What is the difference between a new construction ADU and an alteration ADU?

A new detached ADU follows new construction rules. It requires solar PV, heat pump baselines, battery readiness, and full envelope insulation. An attached ADU or garage conversion typically follows alteration rules. Under alteration rules, solar PV and battery readiness may not apply. In practice, this distinction significantly affects total project cost.

Does my ADU need solar PV under the 2025 code?

It depends on the compliance path. Specifically, new detached ADUs classified as new construction require solar PV. However, ADUs classified as alterations — most garage conversions and attached ADUs — do not require solar PV. Furthermore, we confirm your classification before starting your report.

Does a small ADU under 500 sq ft need a heat pump water heater?

ADUs under 500 sq ft may qualify for a water heating exception. An electric tankless water heater may qualify instead of a heat pump water heater. Additionally, we confirm eligibility when you submit your plans.

How much does a Title 24 ADU report cost?

Title 24 ADU reports start at $250. This includes the CF1R Certificate of Compliance, HERS registration, plan-sized PDFs, and full revision support. See our pricing page for current rates.

How long does a Title 24 ADU report take?

Most ADU reports are ready within 1 to 2 business days after we receive complete plans. Furthermore, rush options exist for urgent submittals.

What plans do I need to provide?

Provide a floor plan with dimensions and north arrow, exterior elevations, window schedule, equipment types, and project address. In practice, more complete plans mean faster delivery.

Can I use an old Title 24 report from 2024 for a 2026 permit?

No. The 2025 code applies to all permits submitted on or after January 1, 2026. Because of this, a report under the 2022 code will not pass plan check. Therefore, all Title 24 Calcs ADU reports use current 2025-code CEC-approved software.